Tell us where and we'll be there
Fire Alarm – Emergency Lighting – Nurse-Call – Access Control – CCTV – PAT Testing

New Build
Working with builders and developers
Electrical installation work on new-build properties involve two distinct stages, namely first-fix and second-fix. This entails careful planning on behalf of the electrical contractor, together with close cooperation with other trades to ensure that the project runs smoothly without compromising completion dates. We have lots of experience of working with builders and developers on new build installations.
First Fix
Accessory boxes are fixed to the wall and cables are installed around the building ready for plastering. It is important to ensure that cables are selected and installed to comply with current industry standards.
Second Fix
Wiring accessories such as socket outlets, light switches and cooker points are fixed to finished surfaces. A vast choice of accessories is available to suit all tastes both traditional and contemporary. Finally, light fittings, extractor fans etc. are installed following manufacturer’s instructions.